Seco/Warwick
Controlled Atmosphere Brazing equipment for today’s heat exchangers industry
Piotr Skarbinski. SECO/WARWICK
A full range of CAB equipment including batch, semi-continuous and continuous equipment will be presented together with peripheral equipment for cleaning of the cores, flux supply and drying units. A special attention will be given for choosing the right type of unit considering the type and size of the heat exchanger and production capacity.
Installation and exploitation aspects of CAB equipment.
Technical and logistic aspects of delivery, installation, start up and commissioning of the CAB line will be presented, including issues like the schedule, utilities and floor requirements. The exploitation aspects will include working costs, maintenance, operator requirements etc.




